Rush Oak Park Hospital is firmly rooted in its community’s history. The hospital stands as a full-service health care facility with expert physicians and staff utilizing modern technology with several locations near Chicago, IL.
Project Details
Location: Chicago, IL
Category: Structural Restoration
Rush Oak Park Hospital in Oak Park, Illinois was experiencing significant damage due to a long-term water problem in an underground unit of the hospital. The unit had been leaking for nearly 20 years, and the extensive damage had rendered the area unusable costing the hospital valuable tenant space.
The cause of the leak was found to be improper below grade waterproofing. The waterproofing system that was installed included a “loose laid” sheet membrane, not a fully bonded membrane as called for in the original designs for the unit. Deficiencies were found in the sheet membrane such as open seams, splits and cuts. Once the sheet membrane was breached, water traveled under the membrane to any crack or opening in the structural slab allowing the water to leak into the building. In addition, the existing drainage board that was designed to funnel water away from the unit was clogged with clay prohibiting it from functioning properly.
In order to stop the leak and effectively prevent future problems, the entire plaza area needed to be excavated to remove the existing membrane and replace it with a new fully adhered, liquid applied waterproofing membrane system. Considering the magnitude of the project, hospital management selected the PREMIERSM Engineered Systems delivery method to complete the work. Premier Engineered Systems combines StructureTec’s engineering expertise and Construction Services Group (CSG) capabilities for design/build delivery.
The unit was located directly below the Emergency Room entrance. To complete the construction, the entire parking lot and drive needed to be excavated, requiring the entrance to be at least partially closed to the public. The hospital had a tenant eager to rent the space, so management decided to close the Emergency Room entrance completely and re-route traffic around the site giving CSG full access to the area. The team had 45 days to complete the project. CSG worked seamlessly with StructureTec to complete the construction plans according to schedule.
Because winter was approaching, CSG worked day and night in order to keep the project moving. Once the lot was excavated and the below grade substrate was exposed, a new fully adhered, liquid applied waterproofing membrane system was installed. CSG also installed a new drain system to effectively route water away from the structure. When it came time to replace the pavement, temperatures dropped too low to finish the project with asphalt. The team worked closely with the engineers at StructureTec to adjust the plans to use concrete. To ensure that the concrete cured properly, the crew brought in Glycol heating blankets to keep the ground thawed and poured the concrete one section at a time. CSG also worked with hospital management to redesign the parking area above. The redesign was not part of the initial plan, but it made the space more usable to hospital traffic by adding parking spaces and expanding the Emergency Room drive, increasing the hospital’s ROI.
StructureTec Group met and exceeded its client’s expectations by completing the project on time, under budget and adding features to the parking area above. The new waterproofing system installed by CSG is best-in-class, allowing the hospital to enjoy a leak free unit for decades to come. Selecting the Premier Engineered Systems project delivery method allowed the project to be fast tracked, quickly giving the hospital use of the unit to begin income generation.
Construction Services Group (CSG) is a full-service specialty contractor offering commercial roofing, structural concrete and building restoration services, ranging from capital projects to strategic repairs, maintenance and emergency leak repair.
ABOUT US
Construction Services Group
9994 International Blvd.
Cincinnati, OH 45246
P: 800-745-7832
SPECIALTIES
LATEST POSTS
The 5 Step Process for Getting Your Facility Budgets Approved
The number one challenge reported by facilities departments is securing funding for maintenance, repairs and capital projects.
The Best Way to Detect Moisture Trapped Within Your Roof
There is much dissension in the marketplace today on the best way to detect moisture trapped in a roofing system.
The Key to Maximizing the Life of Your Pavement
Parking areas, loading docks, and campus roadways have a significant effect on your facilities appearance and functionality.
All Rights Reserved © 2015 | StructureTec Group